You are here

News & Events

GRIDCo Press

 

OUTCOME OF EVALUATION - VTR1/TL/2017

News & Events >>

 GHANA GRID COMPANY LIMITED

 
ICB No.: VTR1/TL/2017                                                                       CREDIT NO.: AFD CGH1109 01H
 
330 kV KUMASI – BOLGATANGA TRANSMISSION LINE PROJECT
 
VOLTA – ACHIMOTA – MALLAM TRANSMISSION UPGRADE PROJECT
 
OUTCOME OF EVALUATION
 
 

1.LEAST EVALUATED BIDDERS

 
LOT 1: VTR1-1: Volta – Achimota Transmission line - SIEYUAN–SEPCO JV of China
                                   
LOT 2 : VTR1-2: Achimota – Mallam Transmission line -  Gammon India Ltd, India
                       
LOT 3  : VTR1-3: K1BSP – K2BSP Transmission line - SIEYUAN–SEPCO JV of China
 
LEAST EVALUATED PRICES: The Price exclusive of local VAT/NHIL Taxes on Construction are as below:
  • Lot 1: VTR1-1: Volta – Achimota Transmission line including its associated Substation Work for the complete scope of works at a price of USD 13,428,035.28 + GHS 1,356,391.08 equivalent to USD 13,726,576.96.
  • Lot 2: VTR1-2: Achimota – Mallam Transmission line at a price of USD 3,022,520.00 + GHS 6,861,043.00 equivalent to USD 4,532,635.56.
  • Lot 3: VTR1-3: K1BSP –K2BSP Transmission line be awarded to SIEYUAN –SEPCO JV of China, for the complete scope of works at a price of USD 6,374,573.00 + GHS 582,692.00 equivalent to USD 6,502,823.51
 
SCOPE OF WORK: The scope of works for the project involves the design, manufacture, inspection, handling, storage, transportation to site and off-loading, erection, testing and commissioning of facilities including relevant substation termination works as summarized below:
  • Lot 1- VTR1-1: Decommissioning and Re-Construction of two (2) 26 km 161 kV Double Circuit (D/C) transmission lines from to Volta – Achimota.
  • Lot 2- VTR1-2: Decommissioning and Re-Construction of one (D/C) 12 km 161 kV transmission line from Achimota to Mallam.
  • Lot 3- VTR1-3: Decommissioning and Re-Construction of one (D/C) 19 km 161 kV transmission line from K1BSP to K2BSP.
 
CONSTRUCTION PERIOD: Lot 1 - Twelve (12) months and Lot 2 and 3 - Eight (8) months
 

2.         EVALUATED BIDS

 
No.
Name of Bidder
Country
Posted Bid Price
Evaluated Bid Price (US$)
1.
Sieyuan - SEPCO.
China
Lot 1: USD 14,351,930.00 + GHS 1,479,675.00
Lot 2:  USD 4,952,427.00 + GHS 415,067.00
Lot 3:  USD 6,748,443.00 + GHS 644,330.00
Lot 1:US$ 13,726,576.96
Lot 2: US$ 4,757,704.37
Lot 3: US$ 6,502,823.51
2.
Gammon India Ltd
India
Lot 1: USD 9,403,502 + GHS 17,480,745
Lot 2: USD 3,266,606 + GHS 7,629,165
Lot 3: USD 5,435,570 + GHS 10,640,856
Lot 1: US$ 14,186,313.91
Lot 2: US$ 4,532,635.56
Lot 3: US$ 7,981,177.65
3.
KEC International
India
Lot 1: USD 13,360,653 + GHS 19,295,081
Lot 2: USD 5,421,452 + GHS 9,373,490
Lot 3:  USD 10,918,454 + GHS 13,056,677
Lot 1: US$ 16,260,398.74
Lot 2: US$ 6,779,729.34
Lot 3: US$ 12,846,432.73
4.
Eiffage Energie
France
Lot 1: EUR 4,663,774.53 + USD 7,796,283.41 + GHS 23,778,408.60
Lot 3: EUR 4,395,466.16 + USD 3,752,515.42 + GHS 11,715,724.55
Lot 1: US$ 19,920,884.38
 
Lot 3: US$ 11,392,868.34
 


3.         REJECTED BIDS
 
No.
Name of Bidder
Country
Posted Bid Price
Reasons For Rejections
1.
JV of MBH POWER LTD & ASTER PVT LTD
NIGERIA
Lot 1: USD 10,948,356.38 + GHS 8,700,767.15
Lot 2:  USD 2,695,856.21 + GHS 1,756,437.94
Lot 3:   USD 5,272,396.92 + GHS 3,582, 909.96
The JV did not meet the specified qualification requirements due to the following:
  • Project references provided did not meet the requirements for specific experiences
  • Did not meet the ESHS requirements.
2.
CONSOLIDATED POWER PROJECTS GROUP AFRICA
MAURITIUS
Lot 1: USD 10,072,005.52 + GHS 20,947,594.52
Lot 2:  USD 2,528,892.73 + GHS 5,117,672.60
Lot 3:   USD 4,330,494.62 + GHS 11,220,006.02
The firm did not meet the qualification criteria specified due to the following reasons:
 
  • Did not meet the requirement on specific construction experience.
  • Did not comply with the requirements for Subcontractors/Manufacturers
3
AMANDI HOLDING LIMITED
BRITISH VIRGIN ISLANDS
Lot 1: USD 15,054,727.95 + GHS 14,094,813.59
Lot 2:  USD 5,438,851.95 + GHS 6,522,473.66
Lot 3: USD 7,409,236.23 + GHS 7,061,810.91
The firm did not meet the specified qualification criteria due to the following:
  • Did not meet the requirements for Construction experience.
  • Did not meet the ESHS requirements.
4
MELEC SAL
LEBANON
Lot 1: USD 10,346,666.71 + GHS 16,758,263.88
Lot 2:  USD 2,688,201.25 + GHS 3,997,069.20
Lot 3:  USD 4,615,784.26 + GHS 6,257,004.17
The firm did not meet the specified qualification criteria due to the following:
  • Did not meet the requirements for Construction experience.
  • Did not meet the ESHS requirements.
  • Submission did not include sufficient documentation to determine Financial soundness of the firm.
5
SKIPPER GHANA LTD (CONSORTIUM)
 
Lot 1: USD 8,058,689 + GHS 15,839,974
Lot 3:  USD 3,611,633 + GHS 7,716,127
The firm did not meet the specified qualification criteria due to the following:
  • Did not meet the requirements for Construction experience.
  • Did not meet the ESHS requirements.
  • Did not comply with the requirements on Equipment
 

Posted: Jul 20 2017

Back